Long RT60 measurements

SimboSaheed

Registered
Thread Starter
Joined
Aug 28, 2023
Posts
3
Hello, first thank you for this absolute weapon of a software. Amazing work!
Now my question:
Sometimes I would like to measure space with long reverberation (>3sec.). Is there a way how to tell the REW to "wait" between repetitions? Beacause with the long RT60 times there is still reverberance going on and the REW is already doing next measurement.
Thank you very much
Simon
 

John Mulcahy

REW Author
Joined
Apr 3, 2017
Posts
8,030
You can set a delay before a measurement starts, but you should use a sweep that lasts longer than the expected RT60 time and make sure the Analysis preference for IR truncation is configured to retain a long enough portion of the impulse response for accurate RT60 calculation.
 
Top Bottom